Go top
Project information

Evaluation of responses to the public consultation on flexible demand connection

T. Gómez J.P. Chaves M. Romeo Monterde M. Martínez E.C. Ormeño-Mejía

August 2025 - October 2025

Funding entity Asociación de Empresas de Energía Eléctrica (aelec), Asociación de Empresas Eléctricas (ASEME), Asociación de Distribuidores de Energía Eléctrica (CIDE), UFD Distribucion Electricidad S.A.


The objective of this project is the evaluation of the responses received to the public consultation on the "Detailed specifications for the determination of the access flexible capacity of demand to the distribution networks under permits type O(profiles) and tupe 1 (Remote disconnection after N-1 contingency" prepared by the distribution system operators, supporting AELEC, ASEME, CIDE, and UFD in this task.


Layman's summary: Support for the public consultation on the flexible connection of demand to distribution networks carried out by distribution system operators in Spain.



Techniques employed: Regulatory Analysis, Network Security Criteria



CONEXION_FLEXIBLE_AELEC